Area covered by planning application = 42.5 ha (105 acres) 
Area of proposed extraction = 22.6ha (56 acres) 

1968 claimed saleable aggregate resource = 17.15 million tons 
2011 claimed saleable aggregate resource = 7.25 million tonnes 
2015 claimed saleable aggregate resource = 1.66 million tonnes 
2017 claimed saleable aggregate resource = 1.2 million tonnes 
2021 claimed saleable aggregate resource = 1.06 million tonnes 

Reduction in saleable aggregate from 2011 geological statement = 85% 
Reduction in saleable aggregate from 2015 planning application = 36% 

Density = 1.9 tonnes/m3 
Waste factor = 20% 
Extraction level = maximum water table 

Phase 1 as-dug = 238,000 tonnes
Phase 2 as-dug = 406,000 tonnes
Phase 3 as-dug = 686,000 tonnes 

Average depth topsoil and overburden to be removed to uncover sand and gravel = 2.65m 
Average depth of sand and gravel = 3.1m

Return haul route to Hillhead, Uffculme, for processing = 46.8 miles 
Number of 28.5 tonne loads of as-dug aggregate (including 20% waste) = 46,667 (previously 52,632) 
Total haulage distance of as-dug aggregate = 2.18 million miles (previously 2.46 million miles) 

Maximum HGV movements per day = 216 
Maximum HGV movements per hour = 20 

Timeframe = 10 years + 2 years restoration 

Height of site = 125-165 mAOD 

Number of years Straitgate Farm owned by Holcim and its antecedent companies = 60

Time from 2015 application to relinquishment = 120 months
Average determination time for sand and gravel quarries = 23 months 

Number of site entrances proposed = 3 (201220152017

Private water supplies at risk = more than 120 people, plus Cadhay estate and several businesses
Mature hedgerows to be lost = 1590m 
Ancient woodland areas with wetland habitats reliant on water from Straitgate = 2 
Agricultural land = BMV Grade 2 & 3(a) 
Monitoring boreholes = 18 
Nearest property = 70m 
Protected species = dormice, bats (11+ species) 
Listed heritage assets affected = 3
Airport safeguarding and consultation zone = yes
Height of flight path above Straitgate Farm for planes landing at Exeter Airport = 195m

Planning applications = 1967, 2015, 2017
Public Inquiries = 1968, 2002, 2016, 2022
Public Consultations = too many to count

Devon sand and gravel reserves at end of 2023 = 3.772 million tonnes 
Devon sand and gravel sales in 2023 = 0.370 million tonnes
10 year sand and gravel sales average = 0.505 million tonnes 
Sand and gravel landbank in 2023 based on 10 year sales average = 7.5 years 
Current Minerals Plan = 2011-2033
Most recent Devon Local Aggregate Assessment = 12th 2013-2022
UK sand and gravel extracted in 2023 = 37.4 million tonnes

Holcim UK/Aggregate Industries CEOs from 2010 to date = 6