The Planning Inspectorate has granted Aggregate Industries permission to extract sand and gravel at Straitgate Farm – despite the fact that the company’s approved plans cannot be implemented without one of the imposed conditions being broken.
As you are aware, the risk of a bird strike on an aircraft can be catastrophic, and as a result all aviation stakeholders do all possible to mitigate against this happening.
Under the Air Navigation Law, it is a criminal offence to endanger an aircraft or its occupants by any means.
The creation of any body of water, particularly on a long term basis, has the potential to create a suitable habitat which encourages an increase in bird activity for nesting, feeding and migration.
Due to the location of the proposed quarry, it is felt that there is a real risk to aircraft if there is an increase in this area.
However, based on comments made on the last day of the Public Inquiry, the condition relating to Airport Safeguarding and the creation of water bodies was strengthened by the Inspectors. It now reads:
This condition, which Aggregate Industries must comply with if it is to quarry Straitgate Farm, is clear and unambiguous. It is not limited by the size or duration of any water body – large or small, permanent or temporary.
What exactly is a water body?
Wikipedia says "The term most often refers to oceans, seas, and lakes, but it includes smaller pools of water such as ponds, wetlands, or more rarely, puddles."
LawInsider goes further. This
helpful graphic also explains.
We also know that Aggregate Industries has form in creating water bodies that attract birds elsewhere at their sites in Devon – just click on the labels
airport safeguarding or
birdstrike, or these posts
here,
here,
here,
here,
here and
here. Below is a photo of a water body left by the company at Hillhead:
But let’s put all that to one side for a moment.
EPHEMERAL WATER BODIES AND SPECIES-RICH WET GRASSLAND TO BE ENCOURAGED IN LOW-LYING INFILTRATION AREAS (IN THE BASE OF THE DEPRESSIONS)
As low points in the quarried landform, water bodies might be expected to form in these areas. But
Aggregate Industries says they are needed for surface water management reasons too:
The features are part of site restoration to ensure the site is restored to baseline conditions with some betterment. The features allow the restored site to mimic natural conditions, but ensure a greater proportion of rainfall passes to ground to provide flow support to the watercourses, rather than passing off-site as overland flow. 2.18.7
So – there is a contradiction. Aggregate Industries’ plans rely on the creation of water bodies, which the Planning Inspectors’ conditions prohibit.
In other words, Aggregate Industries’ plans cannot be implemented without the conditions being broken.
One might ask why the Planning Inspectors granted permission for a scheme that was incompatible with their conditions. Whatever the reason, it would appear there was more concern with approving Aggregate Industries’ scheme than there was in seeing whether it could actually work.